Wednesday, December 30, 2015

Electrical rough-in 90% Complete

There was a hodge podge of electrical work put in over the years.  We are essentially replacing all of it and bringing it up to code.






Eduardo has marked all of the locations for the new pot lights going in the main room and the kitchen, and we opened the ceiling up to make room.


Neither the old toilet or the new one had ventilation fans, so we had to drop the ceiling down to accommodate the new fans going in.


The entire main floor ceiling has to be strapped in order to provide proper support for the drywall.


The older panels have been removed and replaced with a new panel that can accommodate the circuits required for the entire club.  It feels good to get rid of all of that old, potentially unsafe wiring.


By the end of the day, the inspection was passed by ESA and we can continue with other activities.