As we had discovered during primary demo, there's barely a stick of insulation in any of the exterior walls (the basement and joist pockets downstairs is a whole different topic that will need to be addressed in the future). Today we began insulating the walls and preparing the ceiling with a new vapour barrier and strapping for drywall.
No comments:
Post a Comment